OUR EXPERIENCES
Lifting Equipment Fabrication & Installation
Project : Gantry & EOT Crane
Capacity : SWL 1 Ton until 1000 Ton, Span 3 meter until 62 meter
Scope
Manufacturing Crane procedure and minimum Quality requirement is a must. The process must include a method for
ensuring that sufficient Operations Integrity qualification performance of the work, provided skill fitter and qualified
welder according to AWS D1.1. Fabrication is including all alignment of
girder and leg and the other Components,
Installation, Commissioning & Testing.
Project : Rubber Tire Mobile Gantry Crane
Capacity : 40Ton
Scope
Manufacturing procedure and
minimum Quality requirement is a must. In every yard & factory which requires cranes to lift and transfer products or cargos inside workshop and outdoor area, one mobile gantry
crane is absolutely most competitive choice compared any other crane, it own advanced mobility and flexibility
Project : Rubber Tire Mobile Gantry Crane
Capacity : 65Ton
Project : Gantry Crane
Capacity : 1000Ton
Scope
Manufacturing 1000 Ton Crane
used for PT ASL Batam.
Manufacturing procedure and
minimum Quality requirement
is a must.
Project : EOT Crane
Capacity : 40Ton, Span 35 meter
Scope
Manufacturing 40 Ton EOT
Crane with 35 meter span used
for PT ASL Batam. Manufacturing procedure and minimum Quality requirement is a must.
Project : EOT Crane – PT Kim Seah
Capacity : SWL 10 Ton , Span 40 meter
Scope
Manufacturing Crane procedure and minimum Quality requirement is a must. The process must include a method for ensuring that sufficient Operations Integrity qualification performance of the work, provided skill fitter and qualified welder according to AWS D1.1. Fabrication is including all alignment of girder and leg and the other Components, Installation, Commissioning & Testing.
Project : Geo Tube Installation Floating Platform
Scope
Manufacturing Geo Tube
Installation Floating Platform,
Manufacturing procedure and
minimum Quality requirement
is a must. Commissioning & Testing
Project : 93 TON LIFTING PLATFORM
Scope
Fabrication & Installation
Lifting platform, provide
erection method statement
with calculation, key hazards &
mitigation measures
Project : Doulos Phos
Scope
UP Slip the vessel with perfect calculation with risk assessment are needed. Good
preparation, good leadership from start until pulling
Built in the United States in 1914, the MV Doulos has held the record for being the world’s oldest active ocean-faring passenger ship, transported onions and first-class passenger around the world and even served as a floating bookshop.
The ship was launched in 1914 as a freighter named Medina, which transported onions before carrying troops and supplies during the two world wars. It was later renamed Roma and the Franca C, carrying only first-class passengers, before being bought by German-based Christian charity Good Books for All (GBA
Ship).
For the next 32 years, the missionary ship, dubbed the words largest travelling bookstore, carried literature
to more than 100 countries, including Singapore.
But in late 2009, when it becomes too expensive to run and renovate, GBA Ships put it up for sale. In 2013,
Bintan Resorts International, which manages popular tourist spots on the island’s northern coast, agreed to turn it into a land-berthed hotel.
After refurbishments in Batam, it was towed last October to its permanent spot by three tugboats in a 10-
hour journey.
Project : SHIP LAUNCHING
Scope
Launching calculation with risk assessment are needed. Good preparation, good leadership from start until launching progress finish is a must
Project : Up Slip ASL RAIDER
Scope
Up slip calculation with risk
assessment are needed. Good
preparation, good leadership
from start until launching
progress finish is a must
Project : SHIP LAUNCHING
Scope
Launching calculation with risk
assessment are needed. Good
preparation, good leadership
from start until launching
progress finish is a must
Project : SHIP LAUNCHING
Scope
Launching calculation with risk
assessment are needed. Good
preparation, good leadership
from start until launching
progress finish is a must
Project : SHIP LAUNCHING
Scope
Launching calculation with risk
assessment are needed. Good
preparation, good leadership
from start until launching
progress finish is a must
Project : Assembly 4000 ton Boom Crane
Capacity : 4000 Ton
Scope
Provide welder with high
qualifications performed
accordance with AWS D1.1 to
welding special materials grade, preheating, welding, heat treatment must control. Total weight of Crane Boom structure 600 Ton
Project : Pipe Lay Stinger
Scope
Fabrication & Installation of
main stinger, extension stinger, A-frame and hold back. All pipe join are 100 % UT, Final dimensions are within
tolerance accordance with
specification/requirement and
technical drawings.
Project : Dredging Barge
Scope
Fabrication & Installation 4 unit spud carrier and other
equipment with very high
standard and minimum tolerances, all item machining
done at Batam
Project : Cutter Ladder
Scope
Fabrication & Installation
Cutter ladder for dredging and
soil exploration. Quality is a
must, all welding are UT test
and minimum tolerances. Total
weight of structure 750 Ton
Project : FPSO-Accommodation & Helideck
Scope
Fabrication & Installation 200
ton accommodation, other
out fitting and Crane column.
Handling special grade of
material, good welding
performances are required
Project : Conveyor Structure
Scope
Fabrication & Installation
Conveyor Structure.
Total weight of structure is 800
Ton, including installation of
moveable ship loader on top of
structure
Project : Accommodation Rig
Scope
Fabrication & Installation 450
ton accommodation, other out
fitting and leg repaired.
Handling special grade of
material, good welding
performances are required
Project : Drilling Rig
Scope
Repair leg & Mat for 4 unit oil
rig. Handling special grade of
material, good welding
performances are required.
Project : Deck Support Frame
Scope
Fabrication & Installation 800
Ton of steel to support ANGEL
Project Platform for
transportation and installation.
Fabrication should be follow
offshore standard, dimensional
of structure is very critical,
Controlled welding parameters
and consumables during
installation/construction
activities are needed
Project : FSO – Mono buoy repaired
Scope
Repaired damaged mono buoy
arm, realignment, pre assembly
of damaged item, fit up and
welding under SBM
Classification. Total weight of
Arm is 800 Ton.
Project : 500Ton Crane Barge
Scope
Fabrication & Installation Crane foundation for Crane barge SWL 500 Ton. Handling special grade of material, good welding performances are required.
Project : BULLY THRUSTER
Scope
Fabrication of 12 thruster
canister for USA Frontier
Drilling. Handling special
grade of material, good
welding performances are
required. Total weight 950 Ton
Project : WHEEL HOUSE & TOWER MAST – ALUMINIUM
Scope
Fabrication aluminum wheel
house 4 unit. Handling
aluminums material, good
welding performances are
required
Project : HEAVY BUCKET
Scope
Repair heavy bucket, include,
steel renewal, dismantle, realignment & machining until
completed assembly
Project : Dry Dock
Scope
Fabrication & Installation
Dock Gate, 62 meter x 11.5
meter & 29 meter x 9 meter x
2 unit, include crock system
Project : Workshop
Scope
Fabrication & Erection steel structure with spandex, include Civil work & electrical system
Project : Workshop
Scope
Fabrication & Erection
steel structure with
spandex, include Civil
work & electrical system