Lifting Equipment Fabrication & Installation

Project : Gantry & EOT Crane

Capacity : SWL 1 Ton until 1000 Ton, Span 3 meter until 62 meter
Scope
Manufacturing Crane procedure and minimum Quality requirement is a must. The process must include a method for ensuring that sufficient Operations Integrity qualification performance of the work, provided skill fitter and qualified welder according to AWS D1.1. Fabrication is including all alignment of girder and leg and the other Components, Installation, Commissioning & Testing.

Project : Rubber Tire Mobile Gantry Crane

Capacity : 40Ton
Scope
Manufacturing procedure and minimum Quality requirement is a must. In every yard & factory which requires cranes to lift and transfer products or cargos inside workshop and outdoor area, one mobile gantry crane is absolutely most competitive choice compared any other crane, it own advanced mobility and flexibility

Project : Rubber Tire Mobile Gantry Crane

Capacity : 65Ton

Project : Gantry Crane

Capacity : 1000Ton
Scope
Manufacturing 1000 Ton Crane used for PT ASL Batam. Manufacturing procedure and minimum Quality requirement is a must.

Project : EOT Crane

Capacity : 40Ton, Span 35 meter
Scope
Manufacturing 40 Ton EOT Crane with 35 meter span used for PT ASL Batam. Manufacturing procedure and minimum Quality requirement is a must.

Project : EOT Crane – PT Kim Seah

Capacity : SWL 10 Ton , Span 40 meter
Scope
Manufacturing Crane procedure and minimum Quality requirement is a must. The process must include a method for ensuring that sufficient Operations Integrity qualification performance of the work, provided skill fitter and qualified welder according to AWS D1.1. Fabrication is including all alignment of girder and leg and the other Components, Installation, Commissioning & Testing.

Project : Geo Tube Installation Floating Platform

Scope
Manufacturing Geo Tube Installation Floating Platform, Manufacturing procedure and minimum Quality requirement is a must. Commissioning & Testing

Project : 93 TON LIFTING PLATFORM

Scope
Fabrication & Installation Lifting platform, provide erection method statement with calculation, key hazards & mitigation measures

Project : Doulos Phos

Scope
UP Slip the vessel with perfect calculation with risk assessment are needed. Good preparation, good leadership from start until pulling
Built in the United States in 1914, the MV Doulos has held the record for being the world’s oldest active ocean-faring passenger ship, transported onions and first-class passenger around the world and even served as a floating bookshop.
The ship was launched in 1914 as a freighter named Medina, which transported onions before carrying troops and supplies during the two world wars. It was later renamed Roma and the Franca C, carrying only first-class passengers, before being bought by German-based Christian charity Good Books for All (GBA Ship).
For the next 32 years, the missionary ship, dubbed the words largest travelling bookstore, carried literature to more than 100 countries, including Singapore.
But in late 2009, when it becomes too expensive to run and renovate, GBA Ships put it up for sale. In 2013, Bintan Resorts International, which manages popular tourist spots on the island’s northern coast, agreed to turn it into a land-berthed hotel.
After refurbishments in Batam, it was towed last October to its permanent spot by three tugboats in a 10- hour journey.

Project : SHIP LAUNCHING

Scope
Launching calculation with risk assessment are needed. Good preparation, good leadership from start until launching progress finish is a must

Project : Up Slip ASL RAIDER

Scope
Up slip calculation with risk assessment are needed. Good preparation, good leadership from start until launching progress finish is a must

Project : SHIP LAUNCHING

Scope
Launching calculation with risk assessment are needed. Good preparation, good leadership from start until launching progress finish is a must

Project : SHIP LAUNCHING

Scope
Launching calculation with risk assessment are needed. Good preparation, good leadership from start until launching progress finish is a must

Project : SHIP LAUNCHING

Scope
Launching calculation with risk assessment are needed. Good preparation, good leadership from start until launching progress finish is a must

Project : Assembly 4000 ton Boom Crane

Capacity : 4000 Ton
Scope
Provide welder with high qualifications performed accordance with AWS D1.1 to welding special materials grade, preheating, welding, heat treatment must control. Total weight of Crane Boom structure 600 Ton

Project : Pipe Lay Stinger

Scope
Fabrication & Installation of main stinger, extension stinger, A-frame and hold back. All pipe join are 100 % UT, Final dimensions are within tolerance accordance with specification/requirement and technical drawings.

Project : Dredging Barge

Scope
Fabrication & Installation 4 unit spud carrier and other equipment with very high standard and minimum tolerances, all item machining done at Batam

Project : Cutter Ladder

Scope
Fabrication & Installation Cutter ladder for dredging and soil exploration. Quality is a must, all welding are UT test and minimum tolerances. Total weight of structure 750 Ton

Project : FPSO-Accommodation & Helideck

Scope
Fabrication & Installation 200 ton accommodation, other out fitting and Crane column. Handling special grade of material, good welding performances are required

Project : Conveyor Structure

Scope
Fabrication & Installation Conveyor Structure. Total weight of structure is 800 Ton, including installation of moveable ship loader on top of structure

Project : Accommodation Rig

Scope
Fabrication & Installation 450 ton accommodation, other out fitting and leg repaired. Handling special grade of material, good welding performances are required

Project : Drilling Rig

Scope
Repair leg & Mat for 4 unit oil rig. Handling special grade of material, good welding performances are required.

Project : Deck Support Frame

Scope
Fabrication & Installation 800 Ton of steel to support ANGEL Project Platform for transportation and installation. Fabrication should be follow offshore standard, dimensional of structure is very critical, Controlled welding parameters and consumables during installation/construction activities are needed

Project : FSO – Mono buoy repaired

Scope
Repaired damaged mono buoy arm, realignment, pre assembly of damaged item, fit up and welding under SBM Classification. Total weight of Arm is 800 Ton.

Project : 500Ton Crane Barge

Scope
Fabrication & Installation Crane foundation for Crane barge SWL 500 Ton. Handling special grade of material, good welding performances are required.

Project : BULLY THRUSTER

Scope
Fabrication of 12 thruster canister for USA Frontier Drilling. Handling special grade of material, good welding performances are required. Total weight 950 Ton

Project : WHEEL HOUSE & TOWER MAST – ALUMINIUM

Scope
Fabrication aluminum wheel house 4 unit. Handling aluminums material, good welding performances are required

Project : HEAVY BUCKET

Scope
Repair heavy bucket, include, steel renewal, dismantle, realignment & machining until completed assembly

Project : Dry Dock

Scope
Fabrication & Installation Dock Gate, 62 meter x 11.5 meter & 29 meter x 9 meter x 2 unit, include crock system

Project : Workshop

Scope
Fabrication & Erection steel structure with spandex, include Civil work & electrical system

Project : Workshop

Scope
Fabrication & Erection steel structure with spandex, include Civil work & electrical system